GRAVEL-SAND MIXTURE WON BY USING THE WET PROCESS

Germany, Lehrter Bahnhof/Berlin

TASK SITUATION

For the construction of the Lehrter Bahnhof in Berlin one million tons of a gravel-sand-mixture had to be won within a very short time by using the wet process.

REQUIREMENTS

  • Solid output 20,000 t/day
  • Minimum fine sand loss
  • High operational safety

SUCCESSFUL IN USE

SMT STICHWEH washing and dewatering bucket wheels of the E 6518 H series.