
FLEXIBLE: FLOATING PROCESSING PLANT
USA, NEAR LITTLE ROCK – ARKANSAS
TASK SITUATION
Replacement of a cyclone system with downstream dewatering screens.
REQUIREMENTS
- Mixture output (water/sand) of approx. 4,500 m3/h minimum fine sand loss
- Solid output of approx. 1,000 m³/h
- High operational safety
SUCCESSFUL IN USE
Two SMT STICHWEH washing and dewatering bucket wheels of the E 6518 H series. Installation on a floating processing plant. The machines are running since they were commissioned in 2009 without any errors . No need to replace wear parts up to the present day.
Back to reference page